EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
DaveBellairs
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (652)
Research
Workshop
- (4)
Empennage
- (14)
Fuselage
- (54)
-
Vans reply to front...
-
Final installed side...
-
Subpanel rib and...
-
Reinstalled the...
-
Baggage floor pan
-
Flap position sensor...
-
More nutplates
-
More seat pan nutplates
-
Seat pan nutplates
-
Baggage and seat pans
-
Elevator pushrods
-
Sam installed nutplates
-
Baggage area nutplates
-
Torqued rudder pedal...
-
Subpanel mod
-
Subpanel riveting
-
Wire chafing...
-
Brake lines
-
Brake lines
-
Rudder pedals
-
Rudder pedal anti...
-
Rudder pedal paint
-
Rudder pedals
-
Right Seat back
-
Completed SL-00014...
-
SL-00014 tail brace
-
SL-00014 tail brace
-
Modified subpanel
-
Park brake valve
-
Canopy fairing
-
More canopy fairing...
-
Brake lines
-
Canopy glued on
-
More tip up skin pics
-
Clamped cabin frame...
-
Tip up skin
-
Drilling out lots of...
-
Aft fuse rudder...
-
Photo of fuse
-
Cabin frame
-
Cabin frame assembly
-
Cabin frame angles
-
Cabin frame assembly
-
Cabin frame splice...
-
Cabin frame paint
-
Jdair rudder stop
-
Elevator upstop
-
Antisplat vertical...
-
Cabin frame
-
Trimming longeron...
-
More Wing mating
-
Wing mate prep
-
Temporary wing bolt...
-
Wing mating prep
Firewall
- (78)
Tail Feathers
- (40)
Wings
- (105)
Controls
- (6)
Avionics
- (149)
Lighting
- (13)
Instrument Panel
- (9)
Landing Gear
- (4)
Engine
- (159)
Propeller
- (1)
Fuel System
- (7)
Interior Finish
- (3)
Paint / Decals
- (6)
Inspection
Tools
Builder Name:
Dave Bellairs
-
Project:
Vans - RV-7
-
VIEW REPORTS
Total Hours:
1460.9
Total Flight Time:
Start/Last Date:
Jun 24, 2017 - No Finish Date
Engine:
Lycoming IO-360
Propeller:
Whirlwind 200RV
Panel:
Advanced Flight Systems Avionics
Friendly URL:
https://eaabuilderslog.org?s=DaveBellairs
Home or Last Project Picture
Jun 28, 2018
Cabin frame paint
- (1 hour)
Category: Fuselage
Painted interior of cabin frame to test color. Think I'm going to go with something darker.
01A1CA56-95A6-4494-A697-CEFAB2E3FFA9.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.